"Lec 113 - Acrylic Temporary Bridge, Fabrication of Dies, Mounting Cast" Dr. Lorey shows the construction of an acrylic temporary bridge, fabrication of dies from stone cast, and mounting the casts in the articulator. Orig. air date: AUG 22 75 This is part of the Open.Michigan collection at: http://open.umich.edu/education
Video is embedded from external source so embedding is not available.
Video is embedded from external source so download is not available.
Channels: Medical
Tags: Lec 113 - Acrylic Temporary Bridge, Fabrication of Dies, Mounting Cast
Uploaded by: michiganprosthoh ( Send Message ) on 09-09-2012.
Duration: 16m 9s
No content is added to this lecture.
This video is a part of a lecture series from of michigan
Lec 2 - Articulator Demonstration
Lec 4 - Arrangement of Anterior Denture Teeth
Lec 5 - Denture Fabrication: Arrangement of the Anterior Teeth
Lec 6 - Retainers for Fixed Bridges
Lec 7 - Boxing Complete Dentures - Pumice and Plaster Impression
Lec 8 - Partial Denture Treatment Planning
Lec 9 - Multiple Techniques For A Posterior Three Unit Bridge
Lec 10 - Setting Posterior 20 Versus 0 Degree Artificial Teeth
Lec 11 - Design of a Class II Removable Partial Denture
Lec 12 - Selecting and Preserving the Path of Insertion and Removal
Lec 13 - Fabrication of Remount Casts
Lec 15 - Rotational Path Concept in Removable Partial Dentures
Lec 16 - Functionally Generated Path for Removable Partial Denture
Lec 17 - Setting Maxillary Anterior Teeth
Lec 18 - Preliminary Exam and Procedures for Diagnosis
Lec 19 - Maxillary Sectional Tray Construction (Clinic)
Lec 21 - Unilateral Pin Ledge Preparation
Lec 22 - Mucostatic Impression
Lec 23 - Polishing of a Pin Facing
Lec 24 - Pontics for Fixed Prosthesis
Lec 25 - Treating Palatopharyngeal Inadequacy - A Cooperative Approach
Lec 26 - Boxing Maxillary Final Impression
Lec 27 - Custom Acrylic Resin Impression Tray Fabrication
Lec 28 - Cementing of an Anterior Pin Ledge Bridge
Lec 29 - Customized Incisal Guide
Lec 30 - Remounting the Processed Complete Denture
Lec 32 - Maxillary Immediate Complete Denture
Lec 33 - Sectional Tray Construction for Maxillary Immediate Denture
Lec 35 - Anterior Bridge Preparation and Cementation
Lec 36 - Steele's Flatback Pontic
Lec 37 - Porcelain Fused-to-Gold Veneer
Lec 38 - Sequencing Laboratory Procedures for Class IV Cases
Lec 39 - Anterior Multiple Preps
Lec 40 - Correctable Wax Impression
Lec 41 - Pre-Delivery Adjustment of Casting
Lec 42 - Soldering, Finishing, and Polishing an Anterior Bridge
Lec 43 - Clinical Procedures in Bridge Construction
Lec 44 - Presolder Pontic, Finishing, Soldering and Polishing
Lec 45 - Formatray Construction - Posterior Bridge
Lec 46 - Functional Waxing Procedure for Mandibular Technique Bridge
Lec 47 - Laboratory Procedures for Master Models and Dies
Lec 48 - Temporaries and Temporization
Lec 49 - Delivery of Immediate Maxillary Complete Denture
Lec 51 - Waxing the Complete Denture
Lec 52 - Preparation of Immediate Denture for Delivery
Lec 53 - Finishing and Polishing the Complete Denture
Lec 54 - Setting Mandibular Anterior Teeth
Lec 55 - Setting Posterior Teeth
Lec 56 - Pouring Models and Trimming Final Casts
Lec 57 - Mandibular Wax Occlusal Rim
Lec 58 - Requirements of a Master Cast
Lec 59 - Correcting the Master Cast
Lec 60 - Constructing a Partial Denture Part I - Occlusal Path Record
Lec 61-Constructing a Removable Partial Denture Part III
Lec 62-Mouth Preparation Procedures
Lec 63-Impression and Preparation of Master Cast for the Lab
Lec 64-Unilateral Pinledge Preparation
Lec 65-Constructing a Partial Denture Part II - Occlusal Template
Lec 66-Denture Prosthodontic Presentation
Lec 67-Anterior Three-Quarter Crown Preparation
Lec 68-Setting Posterior Teeth for Immediate Maxillary Denture
Lec 69-Setting Anterior Teeth for Immediate Maxillary Denture
Lec 70-Edentulous Maxillary Alginate Impression Technique
Lec 71- Trimming the Edentulous Preliminary Model
Lec 72- Arbitrary Posterior Palatal Seal
Lec 73- Interdigitation of the Pilkington-Turner Tooth
Lec 74- Types of Posterior Artificial Teeth
Lec 75- Complete Denture Processing - Flasking
Lec 76 - Complete Denture Processing - Boil Out
Lec 77 - Complete Denture Processing - Packing and Curing the Flask
Lec 78 - Complete Denture Processing - Deflasking
Lec 79 - Mounting Partially Edentulous Casts
Lec 80 - Oral Shield As a Habit-Control Orthodontic Appliance
Lec 81 - Preparation of an Anterior Pinledge Bridge
Lec 82 - The surveyor and its uses
Lec 83 - Setting Posterior 0 Versus 0 Degree Artificial Teeth
Lec 86 - Facebow Transfer of Maxillary Cast
Lec 87 - Post Ceramic Soldering Technique
Lec 88 - Taking and Pouring Preliminary Impressions (Alginate)
Lec 89 - Maxillary Cuspid Preparation for a Porcelain Fused to Gold Crown
Lec 90 - Anterior Guidance and Esthetics
Lec 91 - Forming the Occlusion Template
Lec 93 - Fabrication of Shellac Base Plates
Lec 94 - Adjusting Posterior Restorations
Lec 97 - Rubber Base Impression, Duralay Coping, Removable Dies
Lec 98 - Fabrication of a Direct Duralay Post
Lec 99 - Mandibular Bicuspid 3/4 Crown Preparation and Temporization